Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: The Turbo Meter
Author: Gerald Christensen
Source: 1969 Western Gas Measurement Short Course
Year Published: 1969
Abstract: One of the problems a measurement man constantly runs into is the erratic load. Part of the day it is large, near the limits of conventional orifice metering. Then, it drops to such a. small load as to make it difficult to measure even with a ten-inch orifice meter If you use positive displacement meters, you usually need two or more and then a series of meter run valves or regulators to close on low loads




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2025