Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: In-Situ Validation Of Esmer Mpfms
Author: Haluk Toral Shiqian Cai Bahar Hosgor
Source: 2016 North Sea Flow Measurement Workshop
Year Published: 2016
Abstract: This paper describes a project for the implementati on of ESMER multiphase meters 1,2 for an entire oil field including the wellhead (one for each one of the 17 wells in the field) and the production lines (one for each one of the t hree production lines). Badra oil field situated in the Wasit Province in E astern Iraq and operated by Gazprom is estimated to hold reserves of over 3 billion barrel s. Current production rate stands at 64,000 bpd from 9 wells. Gazprom aims to raise the production capacity to 170,000 bpd by the end of 2017 when all 17 wells will be produc ing.




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2025