Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: Field Testing And Maintenance Op Large Capacity Displacement Meters
Author: J. P. Mccarthy
Source: 1941 Southwestern Gas Measurement Short Course (Now called ISHM)
Year Published: 1941
Abstract: To insure accurate measurement of gas through large capacity displacement meters, it is essential that rhey be tested and sevviced at regular intervals. The larger they are the more often they should receive this attention. Many natural gas companies have found it practical and economical to test and service, in the field, meters that have capacities over 1.000 cubic feet per liour, rated at a two inch differential. It has also been found most satisfactory to service each meter twice a year, once rn the spring and once in the fall when the temperature is between 60 and 80 degrees P. This is the ideal temperature at which meters should be tested. Circumstances have made it necessary to develop methods for accurately testing and servicing these meters while still In place. These improvements which Irave been made in the methods of testing large capacity meters in the field have been developed to meet the following requirements:




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2025