Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: COPING WITH CHANGING FLOW REQUIREMENTS AT EXSISTING METERING STATIONS
Author: James M. Doyle
Source: 2023 American School of Gas Measurement Technology
Year Published: 2023
Abstract: In todays competitive gas market, utility companies must meet aggressive market strategies or suffer the consequences. All industries have cash registers, and gas distribution is no exception. Our measuring stations are our cash register. The problem is, these stations were designed 10, 20, 30 or even 50 years ago, and are now performing tasks they were not designed for. Therefore, changes must be made. Measurement personnel today must be trained and taught to cope with changing flow requirements. But, modifying a station to meet todays aggressive market can be very expensive. Equipment, such as regulators and the primary element (the meter tube, the orifice plate holder, and the orifice plate), must meet A.G.A. 3 requirements. The secondary element (the recording device) can raise expenditures significantly. Sometimes modifications cannot be made to deliver the specified volume of product needed, and replacement of a complete station is even more expensive. Companies today must watch money closely, and work to reduce operating and maintenance costs.




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2024