Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: Gas-Well Testing
Author: R. L. Harned
Source: 1972 Gulf Coast Measurement Short Course (Now called ASGMT)
Year Published: 1972
Abstract: The basic elements of back-pressure testing involves the measurement of: a. Shut-in Pressure b. Flow-Rate or Series of Flow-Rates c. Well-head Pressure taken at the end of each flow-rate. Using these data it is possible to calculate the deliverability at any specific pressure and the open-flow potential the open-flow potential being the flow expected when the well is open to the atmosphere. ON MULTIPLE COMPLETIONS, EACH ZONE IS CONSIDERED A DIFFERENT WELL AND MUST BE TESTED INDEPENDTLY.




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2025