Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: Field Testing Of Large Capacity Displacement Meters
Author: Charles Mitchell
Source: 1938 Southwestern Gas Measurement Short Course (Now called ISHM)
Year Published: 1938
Abstract: AEGE CAPACITY displacement meters occupy a minority percent of the total number of meters on a transmission system, also they pass a relatively small percent of the total volume. Nevertheless, it is a very important duty of each meter inspector to keep his positive meters accurate. Due to their siae and oftentimes remoteness from the shop it is impractical to bring the meters in for a test, therefore, he must test them on location. Some companies require a test every three months, some every sis months, depending on policy, etc. There are several methods of testing, all of which will give similar results if properly used. The method selected largely depends on company practice as well as the case. I will attempt to discuss these methods and their adaptions.




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2025