Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: The First U.S. Compresses-Air Energy Storage Caes() Plant Status
Author: Bhupen Mehta
Source: American Gas Association 1992
Year Published: 1992
Abstract: The first U.S. compressed-air energy storage (CAES) plant (110-MW 26-hr) was built by Alabama Electric Corporation, Inc. (AEG) in Mcintosh, Alabama, and started commercial operation on May 31, 1991. The Electric Power Research Institute (EPRI) is an active participant in the project, with particular emphasis on R&Drelated aspects, turbomachinery, underground storage, recuperator, scientific measurements, and performance tests. Since the plant is the first-ofits- kind in the United States, valuable lessons have been learned throughout its development and initial operation. This paper summarizes the history of the decision to build the plant and its design, construction, and initial operation.




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2025