Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: Expanding Engineering Training For Pipeline Integrity
Author: Glyn Hazelden
Source: American Gas Association 2004
Year Published: 2004
Abstract: As we become entrenched in the requirements of Pipeline Integrity rulemaking, the needs and demands of an Integrity Management Plan should become second nature within the Pipeline Company or LDC organization. Existing staff will need to develop the design basis and Operating and Maintenance responses to mandates that will become standard. In facing the many decisions on main design, assessment and replacement, engineering personnel should have the necessary tools to successfully address issues that come up. Training of staff will be a key factor in preparing for a successful program.




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2025