Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: Environmental Cleanup Of A Manufactured Gas Plant Site
Author: Alan D. Hatfield,
Source: American Gas Association 1994
Year Published: 1994
Abstract: A manufactured gas plant site, located in Columbus, Georgia was the location of an environmental cleanup in 1992. Manufactured Gas was produced at this site for the years 1854 to 1931. The availability of natural gas in 1931 from a transmission pipeline ended the necessity to routinely manufacture gas however the waste products, primarily coal tar, from the earlier years of plant operation, remained with the site. Insitu solidification was the cleanup method selected, and post monitoring activities indicate that the project was a complete success. The site is now a park and a leading part of riverfront development.




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2025