Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: Well Testing Using Multiphase Meters
Author: Karl Frantzen
Source: 2006 South East Asia Flow Measurement Conference
Year Published: 2006
Abstract: This paper describes one of the first major roll-outs of multiphase meters in the Middle East area. The project started in 1998 and after trial installations and technology evaluation it was decided to install a series of multiphase meters on unmanned wellhead platforms. A total of 9 meters have been installed and has presently been in service for up to 2 years. Another 7 meters will be put in service on new-built platforms. The background for considering multiphase meters as an alternative to well testing by traditional methods is multifaceted. One angle is the opportunity to test a higher number of wells as an MPFM is easier to install, requires less space and are comparably cheaper than a test separator.




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2024