Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: Hope Liner Installation At Sayre Storage: A Case History
Author: Tim Hermann, Tim Koch
Source: American Gas Association 1988
Year Published: 1988
Abstract: Severe internal corrosion was found in several of NGPLs Sayre storage gathering system laterals. In order to mitigate the corrosion problems, high-density polyethylene (HOPE) liners were installed in the NGPL Sayre storage field as part of a rehabilitation project in 1986. A total of 27,000 feet of 4, 6, 8, and 10 liners were installed in both new and existing laterals. The length of liner sections pulled ranged from 122 to 3,642 feet. This paper reviews the reasons for the selection of polyethylene liners and describes the method of installation.




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2025