Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: Communication Between Office And Field
Author: Duane A. Harris
Source: 1998 Gulf Coast Measurement Short Course (Now called ASGMT)
Year Published: 1998
Abstract: The gas industry today is constantly changing, with increasing demands on office and field personnel. Initially there was FERC Federal Energy Regulatory Commission) Order 636 that forced the gas measurement departments into the electronic age. Next came corporate slashing that has required the gas measurement groups to perform at the same level of integrity in measurement with reductions in staff of up to 60%.Then GISB (Gas Industry Standards Board) made its way into the gas measurement department through proposed standardization. To meet these demands requires timely communication between the office and field employees. Both of these locations (field and office) have been impacted with Increased work loads and constant upgrades in equipment and software. With all of this occurring, it is very easy to overlook one of the key links to accurate measurement and that is communication. By the time that a gas day has started at a meter site on a chart recorder or an RTU (Remote Transmitting Unit) until the volume has been calculated or verified in the corporate office, anywhere from 1 to 30 days can pass with as many as 8 to 10 people handling each individual volume record. With this many people involved covering that span of time, communication becomes a vital part of the measurement process.




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2025