Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: Deep Water Pipelining Progress And Projections
Author: J. C. Lochridge
Source: American Gas Association 1977
Year Published: 1977
Abstract: Offshore pipelining has progressed from the 300 foot depth range to nearly 600 feet in the past four years. The capability now exists in the industry to lay pipelines in water depths in excess of 1000 feet. Pipelines are being projected for 2000 feet of water, and in at least one case. 6000 feet of water. This paper reviews some of the techniques that have been developed to bring the industry to its present capability, and discusses some of the problems and proposed solutions for work. in the greater water depths.




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2024