Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: Ways To Improve Meter Shop Efficiency And Reiuce Repair Costs
Author: Errell Hornsby
Source: 1973 Gulf Coast Measurement Short Course (Now called ASGMT)
Year Published: 1973
Abstract: Lone Star Gas Company has been in operation since 1909 and, after extensive study, closed all of their meter repair shops and combined all repair in the current location in Dallas, Texas. The Central Meter Shop began processing meters for all company service areas on January 1, 1968. Since then ve have made use of automated processes that could not have been economically justified at any one of the small regional shops prior to 1968. We are using the assembly line system to make meter maintenarice and repair faster and more efficient. In 1972, the Central Meter Shop cleaned, tested, repaired and painted 86,900 meters with an average of 27 employees. These include medium and large indusrial meters as well as smell residential meters.




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2025