Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: Centralized Maintenance Of Field Compressors
Author: Charles B. Amick
Source: American Gas Association 1978
Year Published: 1978
Abstract: In 1973 Panhandle Eastern Pipe Line Company realized a need for a centrally located maintenance shop to overhaul well pumping units and some portable booster engines. Early in 1974 a part of the pipeline facilities in Liberal, Kansas was converted to a maintenance shop and then on March 4, 1974 they started overhauling. It was apparent from the start that this facility was too small and inadequately equipped to meet the demand of scheduled overhauls and emergency engine outages so plans were started for a large overhaul shop. Construction began in May, 1975 and ihey moved into the new facility in March 1976.




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2025