Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: Pressure Control Automation
Author: Paul R. Sekinger
Source: 2014 Appalachian Gas Measurement Short Course
Year Published: 2014
Abstract: Federal DOT code provides the requirement for inspect - ing and testing pressure reduction equipment. The code states that each district regulator station must be inspected at least once, every calendar year, and the period between inspections can not exceed 15 months. These tests include a regulator Lock Up test. This is a critical performance cri - teria for every regulator. The lock-up test insures the regula - tor will provide bubble tight shut off when the downstream pressure is above the regulators set point. Charts are changed, set points verified, filters inspected, and emer - gency valve operated. Annual inspections maintain the in - tegrity and reliability of pressure reduction stations




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2024