Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: Meter Selection For Various Load Requirements
Author: Clyde C. Bradford
Source: 1979 Gulf Coast Measurement Short Course (Now called ASGMT)
Year Published: 1979
Abstract: Prior to making any meter selection, it is important to become familiar with the gas parameters and load conditions (temperature, pressure, specific gravity, maximum and minimum delivery, steady delivery, cyclic delivery, etc.) that the meter will be subjected to upon installation. The measurement equipment which is best suited for a specific installation may be selected only if all of the pertinent information regarding the load requirements is available and accurate. Partial or inaccurate information regarding the load requirements may result in improper meter selection resulting in early replacement of the meter and related equipment and/or costly errors in the measurement of gas volumes.




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2025