Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: Instrument Performancespecification Problem Or Qa?
Author: Clyde Moss
Source: 1978 Measurement Science Conference
Year Published: 1978
Abstract: IN THINKING BACK THROUGH THE YEARS, I CAN RECALL MISSILE SYSTEM CONTRACTORSS TRESSINGA CCURACIESA ND RELIABILITYO F THEIR SUPPORT EQUIPMENTI N ORDER TO INSURE THAT SYSTEM PERFORMANCEW OULD MEET THEIR CONTRACT CRITERIA, ONE SUCH EXAMPLE WAS THE INS ISTENCE ON THE PART OF A MISSILE CONTRACTOR THAT SIMPSON 260 MULTIMETERSH AD TO BE CALIBRATEDE VERY NINETY DAYS OR ELSE HIS INSTALLATIOENF FORTS WOULD BE QUESTIONABLEA ND HE WOULD NOT STAND BEHIND THEM, DURING THESE SAME TIME PERIODS INSTRUMENTR EPRESENTATIVES AND MANUFACTURERWSE RE COMPLAININGA BOUT COPY CONTRACTS AND LOW BIDDER AWARDS TO LOFT MANUFACTURERS, THE SITUATIONH AS CHANGEDT HROUGH THE YEARS, PARTICULARLYW ITHIN THE METROLOGAYN D CALIBRA TION (METCAL)P ROGRAM




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2025