Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: Performance Of Subsea Multiphase Meters And Topside Test Separator During Well Testing, After Skarv Field Start-Up
Author: Barbara m. Wrobel1, Andrew Hall Lukasz H. Wrobel1 Bp Norge
Source: 2013 North Sea Flow Measurement Workshop
Year Published: 2013
Abstract: Since start-up of the Skarv field in December 2012, subsea multiphase flow meters (MPFMs), and a topside test separator have been routinely used for well testing of both oil and gas-condensate wells. There are five MPFMs installed on Skarv, with three installed on the oil-producing templates and two on the gas-condensate producing templates. There are two production headers on each template and one test header where the MPFM is located. Flow is directed either to the test or to the first stage separator through one of two risers. Figure 1 shows schematically the options for routing flow from the oil and gas-condensate wells, either through multiphase meters or directly to the test or first stage separators




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2025