Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: INTERFACE DETECTION IN LIQUID PIPELINES
Author: Marc Buttler
Source: 2022 International School of Hydrocarbon Measurement
Year Published: 2022
Abstract: Ever since the first pipelines for crude oil were constructed in Pennsylvania in 1862, pipeline technology has continued to evolve to meet the ever increasing demand for more capacity to transport valuable crude oil and refined fuel products. The first trunk lines came soon after, in 1879, but it wasnt until 1943 when the first big-inch cross-country pipelines started to appear.




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2024