Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: Training Program For Contract Construction Inspectors
Author: Harry J. Fork
Source: American Gas Association 1970
Year Published: 1970
Abstract: Prior to 1959, the Philadelphia Gas Works did all main and service installation and replacement work with its own forces. Only a few specialized jobs, such as bridge or river crossings were let to outside contractors. Then, in 1959, our management decided to stabilize the size of the distribution work force based on winter operating and maintenance needs and to contract that portion of work beyond the capability of this force. We have been contracting approximately 93% of our new main additions, 65% of the new service installations, and 53% of our main replacements. Considering the cost of such work, to be assured that we were getting our moneys worth from the contractor and to maintain our standards of safety and quality, management recognized at the outset the need for a comprehensive inspection program.




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2025