Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: Periodic Inspection Of Regulators And Relief Valves
Author: James m. Doyle
Source: 2009 American School of Gas Measurement Technology
Year Published: 2009
Abstract: Inspections and tests on regulators and relief valves are a Department of Transportation (DOT) compliance rule. The sections within the DOT manual stating the rule include 192.351 through 192.359, 192.751, 192.479, 192.481, 192.739, and 192.741. Keep in mind these rules are the minimum required tests. Your company or governing regulatory agency may be more stringent and require more detailed testing. You must also keep in mind that the manufacturer of your equipment will provide guidelines pertaining to maintenance of the equipment. These tests are not only required for safe, reliable service to your customers, but the results could also be used in any legal proceeding for documentation purposes.




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2025