Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: Production Measurement - Invert Orifice Measurement, Contaminant Problems And High Pressure Metering Problems
Author: Richard L. Rex
Source: 1977 Western Gas Measurement Short Course
Year Published: 1977
Abstract: Production measurement problems in the area of most of our field production is due to the weather. We have six months cold and snow, two months of rain and the remainder of the year is hot and dry. Most of our well locations are in high altitudes or remote locations. Due to snow and rain the roads to most well locations are in bad condition several months of the year, making tending these wells very difficult. We have solved the chart changing and well tending problems in some areas by using he1icopters.




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2024