Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: District Regulator Station Design - A Case Study
Author: James P. Davis, Scott A. Laplante
Source: 2004 Appalachian Gas Measurement Short Course
Year Published: 2004
Abstract: This paper outlines a recently developed design concept for buried district regulator stations. It will focus on the research and design findings used by NSTAR to develop the smallest practical prefabricated buried vault considering the following: 1. Standardization of design 2. Regulator sizing flexibility 3. Code mandated venting requirements 4. Installation flexibility 5. Best egress and ergonomics 6. Material selections 7. Cost savings A process improvement team worked three years to develop an approach that has rewarded NSTAR with designs and final installations warmly received by field technicians while saving costs in both capital and O&M.




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2024