Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: Wet Gas Allocation On The Canyon Express Project
Author: Chris Cooley, Chip Letton, Jim Hall
Source: 2003 North Sea Flow Measurement Workshop
Year Published: 2003
Abstract: In September 2002, production from the three fields that together form the Canyon Express Project - Kings Peak, Aconcagua, and Camden Hills - was begun. Drilled in record water depths of 2000 to 2200 meters in the Eastern Gulf of Mexico, each of the nine wells was connected to one of two 12-inch pipelines carrying the commingled wet gas back to the Canyon Station platform for processing, a distance of 91 kilometers away in Main Pass block 261. Dual-differential wet gas meters were chosen for the task of allocating gas and liquid back to individual wells.




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2025