Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: Assessment of measurement error due to phase contamination in turbine and Coriolis meters
Author: Dennis van Putten, Saravanakumar Veerasinghan
Source: 2020 North Sea Flow Measurement Workshop
Year Published: 2020
Abstract: PTTEP field case: PTTEP operates multiple brown fields in Malaysia Crude oil production is of main interest Recent years, production rate has decreased while WLR has increased and fluctuates Custody transfer liquid metering system on these fields similar: Downstream gas-liquid separator, typically 8-10 Helical turbine meter for total liquid measurement WLR from autosampler and WC meter Typical conditions: WLR 5-70%, Ql 250m3/h




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2024