Title: Refcom Refuse( Conversion To Methane)-A Project Review
Author: Peter J. Ware
Source: American Gas Association 1979
Year Published: 1979
Abstract: In 1975, the U.S. Depanment of Energy (formerly ERDA) awarded Waste Management, Inc. a contract to design and construct a proof-of-concept experimental facility to demonstrate the biological gasification of urban solid waste and sewage sludge to produce methane-rich gas. Named RefCOM, the facility will process between 50 and 100 tons per day of the organic fraction of shredded urban refuse. Jacobs Constructors, Inc., a subsidiary of Jacobs Engineering Company of Pasadena, California, was the engineering/ construction management sub-contractor for the project. Construction of the facility was completed by May 1st, 1978, and was followed by a sixmonth start-up phase. The plani has been in daily operation since November, 1978, and is being run in accordance with a predetermined experimental program which will be of two-tofour years duration. Waste Management, Inc. has been awarded an operating contract to manage the program and operate the facility.




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2025