Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: Design & Handling Of A Large Pipeline Plugging Job
Author: B. Vernooy
Source: American Gas Association 1983
Year Published: 1983
Abstract: This presentation highlights some of the details of the design, planning, and operating procedures used to accomplish a 48-inch pipeline repair job. The equipment was specifically designed for the extreme load conditions generated by high fluid pressures in a large-diameter pipe. The planning had to anticipate the unpredictable variables that could arise due to operational demands, weather, or whatever. The award-winning execution was completed with cooperation and effort, and without flow interruption. This is a short story about plugging a pipeline on purpose. This story begins or ends in Alaska, and the project was successful enough to win an award as that states outstanding engineering job of the year.




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2025