Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: Large Capacity Displacement Meters
Author: Hilding Beck
Source: 1944 Southwestern Gas Measurement Short Course (Now called ISHM)
Year Published: 1944
Abstract: PUTTING METER IN SERVICE When a large capacity displacement meter is bei put in service, the downstream valve and the upstream valve should both be closed. The downstreair valve should be left closed and the upstream valvt sbould be cracked open until the meter is completel: full of gas at line pressure. The downstream vai.r is now opened slightly. This is to prevent the mett: from being subjected to an exceedingly high differential while packing the downstream section c the line.




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2025