Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: Equipment Replacement Because Of Obsolescence And Fuel Efficiency
Author: Victor Harbor
Source: American Gas Association 1982
Year Published: 1982
Abstract: Southern Natural Gas Company began its operation on 1-1-30 with 1,250 miles of pipeline and a total of 15,000 HP located in 3 compressor stations (12 engines). System capacity was 100,000 MCFD and the entire project cost less than 39 million, some 10 million less than Southern spent on a single facility last year. The compressor units were Worthington horizontals-1300 BHP, 125 RPM. A single unit cost 55,000 and the cost of piping it up was about 30,000. In 1930, we put a 4 engine installation in for 575,000-foundations buildings, headers, piping, labor and all.




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2025