Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: Startup And Initial Operating Experience Of Public Service Electric And Gas Company Linden Sng Plant
Author: George W. Stubblebine
Source: American Gas Association 1975
Year Published: 1975
Abstract: The Linden SNG Plant is the second plant built and started up by Public Service Electric and Gas Company, the first being at Harrison, N.J. which was started in March 1973. Both plants are based on the British Gas Councils Hydrogasification Method Catalytic Rich Gas Process. The design was engineered by Woodall Duckham Ltd. and Foster Wheeler Corporation with Foster Wheeler being the prime construction contractor. Site preparation was begun in mid 1972 which consisted of filling in 40 acres of meadow land adjacent to the Arthur Kill to 10 feet above mean high tide level. Pile driving commenced in October and steel erection and equipment placement in December. Mechanical completion of the plant was spread over a four month period. Turnover was by completed subsections of the plant as requested by PSE&G to conform with a specified precommissioning and startup sequence.




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2025