Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: Upgrade Of The Harrison And Central Propane-Air Plants
Author: Benjamin H. Bakerjian, Russell A. Novak,
Source: American Gas Association 1993
Year Published: 1993
Abstract: PSE&Gs LPA plants formerly utilized a boiler plant, gas holders, and air jets which were labor intensive. Capital expenditures were justified for the design and construction of vastly more efficient LPA facilities. The new facilities at Harrison and Edison, New Jersey now meet all code requirements and utilize a common design encompassing state-ofthe- art technology. Incorporated in the new design is a flexible mode of operation which provides various levels of control automation and SCADA interface capabilities. The LPA plants were constructed in 1991-1992 and have achieved maximum performance runs. Both new LPA facilities were in operation for the 1992-1993 heating season and supplied critical peakshaving gas supplies.




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2025