Title: Selection And Training Of Operators For The Baltimore Gas And Electric LNG Plant
Author: Edwin L. Poffenberger
Source: American Gas Association 1972
Year Published: 1972
Abstract: In 1950, natural gas was introduced to Baltimore and our Spring Gardens Station was changed from a base load supplier of carburetted water gas to an oil gas peak shaving plant. By 1968, the rising cost of labor and the increased restrictions on air and water pollution made it nece,ssary to find a new low-cost method of supplying supplemental gas. Extensive studies indicated the best solution to our problem was the installation of an LNG peak shaving plant to replace the oil gas manufacturing facility at Spring Gardens. Our company awarded a single-responsibility turnkey contract to Chicago Bridge and Iron Company in April of 1969 to design and construct our LNG plant. This plant was to be completed and on stream by May of 1971. Listed below are the general design specifications for this facility.




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2025