Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: Challenges In The Flow Measurement Engineering Study Phases
Author: Liv Marit Henne, Jean Monnet, Aker Kvaerner Stavanger
Source: 2005 North Sea Flow Measurement Workshop
Year Published: 2005
Abstract: Offshore development of marginal Oil and Gas fields can often be economically profitable if they can be tied in to existing platforms. This usually requires execution of comprehensive feasibility studies, which can often be a long and costly process. Close cooperation in a multidiscipline engineering team is necessary to assure that all possibilities and aspects of the design task have been evaluated. Integration of a new flow measurement module on an existing installation is often the simplest solution, yielding low total cost as the module can be assembled and fully tested on shore. However on many installations one is required to integrate the new equipment in existing modules. Flow measurement is a crucial element in the development of marginal fields which has to be evaluated, taking into consideration all critical aspects such as: available space, weight, location accessibility, maintenance and integration to existing metering systems. In particular, special attention should be given to the possible use of new flow measurement technologies and principles.




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2025