Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: PG&Es Vision For Gas Control
Author: Mel Christopher
Source: American Gas Association 2013
Year Published: 2013
Abstract: 30 diameter gas pipeline ruptured near San Francisco, CA Injuries, loss of life, and property damage 60 to 90 minutes to shut off the gas NTSB Gas Control Recommends (Sep, 2010 to Aug, 2011) PG&E Gas Control Actions Revise your work clearance procedures to include requirements for identifying the likelihood and consequence of failure associated with the planned work and for developing contingency plans. Establish a comprehensive emergency response procedure for responding to large-scale emergencies on transmission lines. Equip your SCADA system with tools to assist in recognizing and pinpointing the location of leaks, including line breaks such tools could include a real-time leak detection system and appropriately spaced flow and pressure transmitters along covered transmission lines




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2025