Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: Developing Measurement I Nfrastructure In Bp Azerbaijan
Author: Bill Pearson Faig Nasirov I Lgar Gurbanov
Source: 2010 North Sea Flow Measurement Workshop
Year Published: 2010
Abstract: This paper covers the development of a sustainable Measurement Operation in BP Azerbaijan Strategic Performance Unit (AzSPU). The Early Oil Project (EOP) metering consisted of 7 BP operated Fiscal, or Class 1 1, metering stations in 2004, burgeoning to 16 operated and 3 non-operated Fiscal metering stations in 2009 through the Azeri-Chirag-Guneshli (ACG) Field Development Project Phases. In addition to the Fiscal meters, there are around 120 Allocation, or Class 2, 1 meters either as standalone instruments or as virtual meters




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2024