Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: Achieve USM Field Accuracy
Author: Charles Derr
Source: 2017 CEESI North American Custody Transfer Measurement Conference
Year Published: 2017
Abstract: All of these production meters will need field design calibration planning data points selected, piping treatments provided, field mating site piping planning to avoid installation effects. Before they leave for calibrations, You should spec out: Calibration points maximized for real service ranges (several of the 7-10 typ. flow pts. in the normal range). Pipe end treatments specified to be in place at calibration ( and arrive pre-installed where its rational to do so). Specify which tube sections/intersections can/cannot be unbolted for transport after calibration. Specify that any intersections must have the gasket centered without intrusion on re-bolt-up.




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2025