Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: He Westex Gas Storage Facility: An Integrated Bedded Alt Cavern, Horizontal Well Reservoir And Vertical Well Eservoir Storage Facility
Author: Jay Evans, Jr.
Source: American Gas Association 1994
Year Published: 1994
Abstract: rhis paper will describe the planning and construction involved he first gas storage facility to integrate into a single complex: rn storage (Salado), vertical well reservoir storage (Loop) and izontal well reservoir storage (North Felmac). The Salado Gas rage Project, with 3 Bcf of working gas under development, is the : storage facility constructed in bedded salt exclusively for the age of natural gas in the United States. The Loop Gas Storage ject is a vertical well reservoir with 9.4 Bcf of working gas. The th Felmac Gas Storage Project is a horizontal well reservoir with Bcf of working gas. This WesTex Facility combines high deliverity cavern and horizontal well storage with the capacity of reser- storage to make one of the most unique storage facilities for aral gas in the country.




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2025