Title: LNG Tank Purging, Entry, And Inspection
Author: Leonard Devanna, George Doulames
Source: American Gas Association 1975
Year Published: 1975
Abstract: Lowell Gas Company in a period of nine weeks successfully purged a 1 Billion cubic foot LNG tank out of service, made necessary repairs and modifications and returned the tank to service. All of this was made possible by maintaining a nitrogen atmosphere in the tank throughout the entire operation. The success of the project can be attributed to pre-planning, when detailed safety, operating, and training procedures were prepared. Several consultants, each one an expert in his field, were used in developing and carrying out the entire operation.




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2025