Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: Real Time Model-Success
Author: Michael L. Wheeler, William E. Brogan
Source: American Gas Association 1994
Year Published: 1994
Abstract: Panhandle Eastern Pipe Line Company has implemented a Real Time Transient Pipeline Model as an aid to Gas Control. The original intent of the implementation was to supply on-line pack and calculated values where measurements were unavailable. This paper describes the problems encountered during the implementation and the degree of success in addressing them. Implementation on the Panhandle system presented several special challenges due to the size of the Panhandle system, number of, and availability of measurements, the configuration of compressor stations and the work required to set up and maintain the model.




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2025