Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: Construction Materials Acquisition Using Automated Bills Of Material
Author: Donald G. Olafson, Rhys K. Harrison
Source: American Gas Association 1981
Year Published: 1981
Abstract: A few years ago when NOVA first developed a computerized materials management system, one of the problems to be addressed was the design of an effective ordering method for construction materials. The ordering of operations material can normally be handled by familiar minimum/ maximum or re-order point methods. When these systems are automated to monitor variable material usage and lead times, many of the error-prone aspects of ordering and inventory control can be eliminated. The ordering of construction material, however, is more critical and requires different methods. Large volumes of data are generated to describe the complex phases and details of a single project. Effective coordination of the design engineering, materials management and construction functions is essential to avoid serious project overruns and timing delays. A well designed ordering system can therefore contribute significantly to the success of large construction projects.




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2025