Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: Grounding Practices For Automation Controls
Author: Alan Rebeck
Source: 2005 American School of Gas Measurement Technology
Year Published: 2005
Abstract: Whether lightning damage or lightning voltages induced between equipment cabinets as a result of multi-grounding causing mis-operation of computerized electronics, improper grounding can account for up to 40 percent of power-related problems including costly damage and downtime. In addition, transient overvoltages-a high voltage spike or impulse of very short duration-can account for another 40 percent if not adequately suppressed. Transient overvoltages can be produced by lightning, power companies switching feeders or capacitor banks, or load switching at customer facilities. These large voltages, lasting only a short period of time, are injected into power and data circuits causing equipment destruction and safety hazards. Problems like these can be avoided by implementing a single-point grounding system, while following the National Electrical Code (NEC) when installing the safety ground and grounding electrode systems, and the use of a properly designed and selected surge suppressor.




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2025