Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: Flow Assurance: Why Subsea Sampling Is On The Critical Path
Author: Bruno Pinguet Michael Smith Eivind Vethe Bernard Theron Onur Ozen
Source: 2014 South East Asia Flow Measurement Conference
Year Published: 2014
Abstract: ubsea business is growing rapidly around the world an d it is going deeper and deeper, with increasing tie back lengths. It is no longer possible to produce each well through a single pipeline or riser. Tie backs of fluids with different properties are commonly used to further reduce the cost of production up to the FPSO or host platform before processing. In the North Sea, for instance, some oil operators will be producing simultaneously gas condensate and h eavy oil to the same platform f r o m different reservoir layers in the same area




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2025