Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: CONTROL ROOM MANAGEMENT-ARE YOU IN CONTROL?
Author: Julie Porcaro, David Weeden
Source: 2019 Appalachian Gas Measurement Short Course
Year Published: 2019
Abstract: Starting in 2011, many pipeline operators were required to implement the requirements listed in 49 CRF 192.631 - Control Room Management. Many of the requirements were either identied as necessary after a review of pipeline incidents or are considered industry best practices. Some of the high-level requirements listed in 192.631 are: Control Room Operations o Training on system operations o Shift Scheduling Fatigue Management Shift Change Protocols o Operator Roles and Responsibilities o Documentation of Actions during normal and abnormal operating conditions o Communication Between Control Room and Field Between Control Room and Management




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2025