Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: Newberry Testing Facility
Author: L. J. Kemp
Source: 1970 American School of Gas Measurement Technology
Year Published: 1970
Abstract: The basic concept of the Southern California Gas Companys large volume high pressure testing facility has recently been completed. It has been designed for an extremely wide range of testing capabilities and to be virtually independent of normal pipeline operations. Both long term run-in and short term accuracy testing can be accommodated. For instance flow rates from 750 MM cf/day to near zero at pressures from 400-700 psi can economically be run 24 hours a day for months at a time. Short term accuracy tests can be economically run at any flow rates and pressures, This facility located near Newberry Springs, California has been under development for over three years. As shown by Figure I, its location is about half way between Los Angeles and Las Vegas, near the junction of the Pacific Lighting Service Company Transmission Line 235 and the Southern California Gas Company Transmission Line 3O0O. The Southern California Gas Company Newberry Compressor Station is located at the junction of these two lines.




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2025