Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: Our Experience With Thin-Film Coating
Author: James O. King
Source: American Gas Association 1972
Year Published: 1972
Abstract: In order to give a better idea of our operating conditions, I would first like to introduce our system. The Texas Gas pipeline system consists of 5,760 miles of pipeline and 475,000 horsepower of compressor station facilities. Our system extends into seven stales, including Texas, Louisiana, Mississippi, Arkansas. Tennessee, Kentucky, Indiana and Ohio. The Texas Gas system is probably no different from others in ihat some of our major coating problems, from an operating standpoint, have been caused by temperatures on the discharge of compressor stations or high soil stresses in certain locations and combinations of these two conditions.




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2025