Title: Initial Testing And Calibration Of Reactor Nuclear Instrument Systems
Author: T. Pearson
Source: 1974 Measurement Science Conference
Year Published: 1974
Abstract: Control and Instrumentation testing at both the component and system level is performed during nuclear power plant construction preoperational and startup phases. Preoperational testing is the most extensive in both detail and applied effort. Specifications and instructions for Boiling Water Reactor nuclear steam supply system tests are prepared by the reactor vendor from plant design information and technical specifications using Institute of Electrical and Electronics Engineers (IEEE) standards as general guide lines. Actual test procedures are the responsibility of the utility and are usually cookbook versions of the vendors instructions.




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2025