Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: Methods Of Field Testing Large Capacity Displacement Meters
Author: Walter Kitson
Source: 1967 Southwestern Gas Measurement Short Course (Now called ISHM)
Year Published: 1967
Abstract: With the cost of gas at the wellhead increasing and the large volumes being measured to industrial customers, irrigation pumps, and city gate stations by large capacity displacement meters at high pressure, it is extremely important that the meter proof be maintained as near 100% as possible. If it is not so maintained, it will result in loss of revenue to the seller or in a dissatisfied customer. This paper will deal with field testing meters with a critical flow prover.




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2025