Email Document Reference

Enter your email address below and the reference for this document will be sent to shortly from webmaster@ceesi.com.

Title: Electrical Maintenance And Calibration
Author: John F. Beck
Source: 1971 Appalachian Gas Measurement Short Course
Year Published: 1971
Abstract: A formal preventative maintenance program should be in use by all Electroscanner owners. Such a program will insure the quality of the data obtained. Maintenance will be either routine, that performed by the operator, or major, that performed by manufacturers service engineer. Operator performed maintenance will require use of an oscilloscope. The scope should be of better quality with provisions for calibrated vertical and horizontal sweep and external triggering sync. We recommend one made by Tektronix. The operator should also have a set of precision test charts for routine test and adjustment. These are available from UGGl for each scan station. We recommend a set of seven for each station. The full set should be used each time a station is turned on.




In order to prevent spam and automated file downloads for documents within the Measurement Library, please follow the instructions below and then you will be able to email a reference to this article.





Copyright © 2025